Whitefield metro on the Purple Line: stations, timings and what it means for homebuyers

Whitefield Metro: Purple Line Stations, Timings and What It Means for Buyers (2026)

The Whitefield metro is the eastern end of Namma Metro’s Purple Line, and since March 2023 it has changed how a lot of people in this part of Bengaluru get to work. Six stations now run along Whitefield Main Road and ITPL Road, from Kundalahalli to the terminus at Kadugodi. This guide covers each Whitefield metro station, when the stretch opened, how fares and frequency work, what’s still missing (the airport link, mostly), and how to check a “5 minutes to metro” claim before you pay extra for a home.

Key takeaways

  • The Whitefield metro is the Purple Line’s eastern arm. The full line runs 43.49 km and 37 stations, Whitefield (Kadugodi) to Challaghatta
  • The Krishnarajapura–Whitefield section opened to the public on 26 March 2023. The last gap, Baiyappanahalli to KR Pura, opened on 9 October 2023
  • Six stations sit in Whitefield proper: Kundalahalli, Nallurhalli, Sri Sathya Sai Hospital, Pattandur Agrahara, Kadugodi Tree Park and Hopefarm Channasandra, plus the Whitefield (Kadugodi) terminus
  • KR Pura will become the interchange with the Blue Line to the airport. That section isn’t open yet; published dates run from 2027 to 2028
  • No Whitefield metro extension to Hoskote has a sanctioned plan. Only a 588 m reversal track past Kadugodi has been contracted
Whitefield metro on the Purple Line: stations, timings and what it means for homebuyers

What the Whitefield Metro Is

When people in east Bengaluru say “the Whitefield metro”, they mean the Purple Line. It’s Namma Metro’s east–west corridor, run by Bangalore Metro Rail Corporation Limited (BMRCL). The full line runs from Whitefield (Kadugodi) in the east to Challaghatta in the south-west.

It’s 43.49 km long with 37 stations, according to Wikipedia’s Purple Line page. Of those, 31 are elevated, 5 are underground (the stretch under MG Road, Majestic and the old city) and one, Baiyappanahalli, is at grade.

So a single train takes you from ITPL to MG Road, Majestic and on to Mysuru Road and Kengeri. End to end, the line takes 82 minutes.

The part that matters for Whitefield is the 13.7 km eastern extension from Krishnarajapura (KR Pura). It runs along Whitefield Main Road and ITPL Road, past the big tech parks, to the terminus next to Whitefield railway station.

In one line: the Whitefield metro is the Purple Line’s eastern end. It’s open, it’s elevated, and it runs straight through to MG Road without a change.

Whitefield Metro Stations, in Order

Here are the fourteen Purple Line stations from Baiyappanahalli out to Whitefield, in travel order. All are elevated except Baiyappanahalli.

# Station Area it serves Note
1 Baiyappanahalli Old Madras Road, Indiranagar edge At grade; former eastern terminus
2 Benniganahalli Tin Factory, ORR junction Opened October 2023
3 Krishnarajapura (KR Pura) KR Puram, ORR Future Blue Line interchange; KR Puram railway station
4 Singayyanapalya Mahadevapura Near the ORR tech parks
5 Garudacharpalya Garudacharpalya, Mahadevapura Elevated
6 Hoodi Hoodi junction Elevated
7 Seetharampalya Seetharampalya, ITPL Road Elevated
8 Kundalahalli Kundalahalli, Brookefield Elevated
9 Nallurhalli Nallurhalli, Whitefield Elevated
10 Sri Sathya Sai Hospital EPIP Zone Elevated
11 Pattandur Agrahara ITPL, Park Square Mall Three entry points
12 Kadugodi Tree Park Kadugodi, Whitefield Main Road Elevated
13 Hopefarm Channasandra Hope Farm junction Elevated
14 Whitefield (Kadugodi) Kadugodi, Whitefield railway station Terminus; rail and bus interchange

Stations 8 to 14 are the ones most people mean by the Whitefield metro. If you’re house-hunting, these seven are the ones to plot against your shortlist.

Pattandur Agrahara and Kadugodi Tree Park

These two are the busiest for the ITPL crowd. Pattandur Agrahara station is on Whitefield Main Road, close to ITPL and Park Square Mall. It has three exits: one towards Thigalarapalya, one towards the Pattandur Agrahara side, and one towards ITPB and the mall.

Kadugodi Tree Park is the next stop east. NVT’s brochure for its Oikos project puts it 5 minutes’ drive from the site. For what the streets behind these stations are like to live in, see our Pattandur Agrahara area guide.

Whitefield (Kadugodi) terminus

The end of the line sits in Kadugodi, next to Whitefield railway station and the Kadugodi BMTC bus terminus. It’s the only station on this stretch with a rail interchange. Parking there is for two-wheelers only, so don’t plan on driving in and leaving a car.

When the Whitefield Metro Opened

The Purple Line opened in pieces over twelve years. The Whitefield metro was one of the last.

Date Section opened Length
20 October 2011 Baiyappanahalli – MG Road 6.70 km
16 November 2015 Magadi Road – Mysuru Road 6.40 km
30 April 2016 MG Road – Magadi Road (underground) 5.12 km
30 August 2021 Mysuru Road – Kengeri 7.5 km
26 March 2023 KR Pura – Whitefield (Kadugodi) 13.71 km
9 October 2023 KR Pura – Baiyappanahalli, and Kengeri – Challaghatta 2.10 km and 2.05 km

Trial runs on the Whitefield–KR Pura stretch began on 25 October 2022. The Prime Minister inaugurated it on 25 March 2023 and it opened to passengers the next day.

For about six months after that, the eastern stretch was an island. You rode to KR Pura, got off and took a bus or cab across the gap to Baiyappanahalli. That gap, with one station at Benniganahalli, closed on 9 October 2023. Since then it’s been one continuous line.

The lesson for buyers is in the dates. Work on this extension started years before 2023, and residents along Whitefield Main Road lived with barricades, diversions and dust the whole time. Metro construction years are hard years.

Whitefield Metro Fares, Frequency and Timings

Hours. The Purple Line runs from about 5 am to midnight, according to Wikipedia. Exact first and last train times vary by station and day, so check BMRCL’s current timetable for your station.

Frequency. Trains run more often at peak hours than mid-day. The only detailed headway table we could find is from 2017, before this stretch existed, so we won’t quote it. Ride it at your own commute time and count.

Fares. BMRCL revised fares on 9 February 2025. News reports put the minimum at ₹10 for short trips and the maximum at ₹90 for journeys over 30 km. After public complaints, BMRCL changed how distance is counted. Smart card users get 5% off. A fare committee also allowed for yearly increases of up to 5%, so check the current fare chart before you budget.

Journey time. End to end, Whitefield to Challaghatta, is 82 minutes. Whitefield to MG Road is well under that, and it avoids Old Airport Road entirely.

Our tip: ride the line at 8.45am on a weekday before you decide anything based on it. Trains at peak are full from the first few stations, and the walk from your gate to the platform counts as much as the ride.

A metro line is worth more when you can change trains. Here’s what the line connects to today, and what’s coming.

  • Whitefield (Kadugodi) — Whitefield railway station and the Kadugodi bus terminus. Open.
  • Krishnarajapura — KR Puram railway station today. The Blue Line interchange is under construction.
  • MG Road — future interchange with the Pink Line, which is under construction.
  • Majestic — Green Line, KSR Bengaluru railway station and Kempegowda bus station. Open.
  • Sir M Visvesvaraya — future Red Line interchange, approved but not built.

The Blue Line at KR Pura

This is the one Whitefield residents wait for. The Blue Line runs from Central Silk Board along the Outer Ring Road to KR Puram (Phase 2A), then north via Hebbal to Kempegowda International Airport (Phase 2B).

Phase 2A construction began in August 2021. Wikipedia gives three different opening dates for it: March 2027, June 2027 and December 2027. Phase 2B started in February 2022, with dates from late 2027 to December 2028.

When both open, you’ll be able to go from Kadugodi Tree Park to the airport with one change at KR Pura. Until then, the airport is a cab ride, usually via Old Madras Road or the Hoskote side.

The southern Blue Line also matters for Sarjapur Road. Our guide to the Sarjapur Road metro covers the Red Line that will cross it at Agara and Ibbaluru.

What’s Planned Next for the Whitefield Metro

Less than you might hear from a sales team.

A 588 m stub past Kadugodi. BMRCL awarded a ₹48.62 crore contract in early 2024 to extend the track 588 m beyond the Whitefield terminus towards Belathur Colony on Whitefield–Hoskote Road. It has no new stations. It’s a crossover so trains can reverse more efficiently, which should help frequency.

Hoskote. In November 2023 the state government said it planned to extend the Purple Line to Hoskote in the east, “in the future”. We found no sanctioned project report, budget or construction contract for it as of October 2026. A Lok Sabha question in August 2025 asked about a Whitefield–Malur extension; we couldn’t confirm what the answer said.

New trains. More train sets have been ordered for the line, which should help crowding at peak. Delivery dates have slipped before, so don’t count on a specific month.

The honest status: the Whitefield metro ends at Kadugodi and will for years. A Hoskote extension is an announcement, not a project. If a home past Kadugodi is sold on “upcoming metro”, ask for the sanction order.

What the Whitefield Metro Means for Homebuyers

A working station is the one thing a planned station can’t match. The Whitefield metro is open now, so homes near it get the benefit today, not in 2033.

Here’s how we’d think about it.

Walking distance is what counts. A flat 600 m from Kadugodi Tree Park gets a real daily benefit. A villa 2.5 km away gets less, because you still need a car, auto or cycle to reach the platform. “5 minutes to metro” in a brochure is almost always a drive.

Villas sit further out. Most gated villa communities in Whitefield are a short drive from a station, not a walk. That’s fine if you drive to work. If the metro is your main reason for buying, compare a flat near a station against a villa and price the difference. Our guide to villas in Whitefield covers what’s available and at what cost.

Rents follow the stations. Tenants who work at ITPL or along the ORR will pay more for a home they can walk from. If you’re buying to rent out, distance to a station matters more than the clubhouse.

The price has mostly moved. The line opened in 2023. Asking rates near the stations already include it. Don’t let anyone charge you for metro “appreciation” that happened three years ago.

Compare like with like. When two homes are quoted per square foot, check which area the rate uses. A villa priced on built-up area and a flat priced on super built-up area aren’t comparable. Our explainer on carpet area vs built-up area shows how to convert.

Two neighbourhoods right on the line are worth a look: Nallurhalli, by its own station, and Thubarahalli, between the Purple Line and the Outer Ring Road.

For flats, one example close to the Kundalahalli end is Sumadhura Solace in Thubarahalli.

For a villa near Kadugodi Tree Park, our page on NVT Oikos sets out the RERA number, the floor plans and a full cost sheet.

How to Test a Whitefield Metro Claim

Every project between Hoodi and Hoskote says it’s “near the Whitefield metro”. Here’s a five-step check.

  1. Ask for the station by name. “Near metro” isn’t an answer. “Kadugodi Tree Park, 1.8 km by road” is.
  2. Measure gate to platform. Use a map from the project’s main gate to the station entrance, by road. Add the walk inside the community, which in a large project can be 400 m on its own.
  3. Do it at 8.45am. Drive or walk to the station at peak on a weekday, then ride two stops. A “5 minute” drive on Whitefield Main Road can take 15 at school time.
  4. Check the parking. If you plan to drive to the station, find out where you’d leave the car. At Whitefield (Kadugodi), parking is for two-wheelers only.
  5. Treat extensions as zero. Anything past Kadugodi, and anything said about Hoskote, has no sanctioned plan. Price the home as if it’ll never come.

None of this makes the Whitefield metro less useful. It’s open, it’s direct to MG Road, and the airport link via KR Pura is under construction. It just means you should pay for the distance you’ll actually travel, not the one in the brochure.

FAQs on the Whitefield Metro

Which metro line goes to Whitefield?

The Purple Line. It runs 43.49 km and 37 stations from Whitefield (Kadugodi) to Challaghatta, through KR Pura, MG Road and Majestic.

When did the Whitefield metro open?

The KR Pura to Whitefield (Kadugodi) section opened to the public on 26 March 2023. The KR Pura to Baiyappanahalli gap opened on 9 October 2023, making it one continuous line.

What are the Whitefield metro stations?

Kundalahalli, Nallurhalli, Sri Sathya Sai Hospital, Pattandur Agrahara, Kadugodi Tree Park, Hopefarm Channasandra and the Whitefield (Kadugodi) terminus. Seetharampalya, Hoodi and Garudacharpalya are further west towards KR Pura.

Can I reach the airport by Whitefield metro?

Not yet. You’ll change to the Blue Line at KR Pura once it opens. Published dates for the KR Puram to airport section run from late 2027 to December 2028.

Will the Whitefield metro be extended to Hoskote?

The state announced the idea in November 2023, but we found no sanctioned project or contract as of October 2026. Only a 588 m reversal track past Kadugodi has been awarded.

What is the Whitefield metro fare to MG Road?

Fares depend on distance. After the February 2025 revision, reports put the range at ₹10 to ₹90, with 5% off on smart cards. Check BMRCL’s current fare chart for your exact trip.

Sources we checked (October 2026): Wikipedia’s Purple Line, Blue Line, Whitefield (Kadugodi) and Pattandur Agrahara station pages; news reports on the February 2025 fare revision; reporting on BMRCL’s Whitefield extension contract; NVT Quality Lifestyle’s Oikos brochure for the drive time to Kadugodi Tree Park. Fares and timetables change, so confirm them with BMRCL before you rely on them.

Buying near the Whitefield metro? Talk to us first

Tell us where you work and how you’d travel. We’ll check each shortlisted home against the real walk to the station, today’s roads and the RERA record before you visit.

Talk to us

Share :
Picture of Michael  Solkjaer
Michael Solkjaer

Vivamus elementum semper nisi. Aenean vulputate eleifend tellus. Aenean leo ligula, porttitor eu, consequat vitae, eleifend ac, enim.

Talk to property expert

  • Free Site Visit, Better payment plan

Maven Realty

We are a Bengaluru channel partner, not a broker. We sell homes from Brigade, Prestige, Godrej, Lodha and Arvind — at the builder’s own price, because our fee comes from them, not from you.

What you get from us is the part nobody else puts in writing: what a project actually costs after statutory charges, what the Khata really says, and which pockets we would avoid.

follow us